top of page
  • Admin

Boda Bodas will not be allowed to operate in Kampala City Centre

Updated: Aug 23, 2020


Kampala Capital City Authority working with the Ministry of Works and Transport has issued strict measures to streamline and regulate operations of Boda Bodas in the city.


Boda Bodas which are resuming operations on Monday 27, July will no longer be allowed to access many areas in Lugogo, Kololo, Wandegeya, Nakasero, and Clock Tower in a bid to stop congestion and stem #coronavirus transmission.

“Following the recent National address on Covid19 by President Museveni, Boda Bodas are to resume carrying passengers and luggage on the 27th July 2020.


A set of Standard Operating Procedures for all the Boda Bodas operators nationwide has been issued by the government through Ministry of Works and Transport,” Kampala, Minister Betty Amongi said in a statement.



Read the KCCA full statement on new regulations:


Following the recent National address on Covid19 by His Excellency the President of the Republic of Uganda, Boda Bodas are to resume carrying passengers and luggage on the 27th July 2020.


Consequently, a set of Standard Operating Procedures (SOPs) for all the Boda Bodas operators nationwide have been issued by Government through Ministry of Works & Transport and Ministry of Security.


Specifically for Kampala Capital City, all Boda Bodas MUST follow and comply with Cabinet Directives on the reforms to streamline and regulate the operations of motorcycles in the City and these include the following;

All Boda Bodas must operate at gazetted Boda Boda stages. The list of these stages and maps can be obtained from KCCA website or Ward Administrators at every KCCA Division. Each gazetted stage has a unique reference code and this will be its name.


All Boda Boda operators must be registered at any of the gazetted stages and this shall be their address to enable contact tracing in case of Covid19 infection. Boda Boda operators are free to register at any gazetted stage of their choice.


All Boda Boda App companies and associations shall share the register of all their members (after registering every member to a gazetted stage).


All Boda Bodas who do not operate or belong to the App. Companies/associations shall register with KCCA through their stage leadership. Forms can be downloaded from KCCA website or picked from Ward Administrators at every KCCA Division.

No Boda Boda operator shall pay any fees to anybody to register on any gazetted stage of choice. Anybody soliciting a bribe should be reported to the relevant authorities.


Cabinet approved Boda Boda Free Zone where All Boda Bodas are prohibited from entering/accessing. The Boda Boda Free Zone will run along the following boundaries; Wampewo Roundabout- Jinja Road to Kitgum House junction – Access Road – Mukwano Road to Clock Tower –Kafumbe Mukasa Road –Kisenyi Road –Mackay Road- Kyaggwe Road- Watoto Church-Bombo Road – Wandegeya – Hajji Musa Kasule Road- Mulago roundabout- Kamwokya junction – Sturrock Road – Prince Charles Drive- Lugogo Bypass–Jinja Road- Wampewo Roundabout.


KCCA is procuring Boda Boda Stage Signs to mark the gazetted stages permanently and Traffic signs to demarcate the Boda Boda Free Zone as approved by Cabinet.


All Boda Boda Operators must comply with all the directives and strictly follow Standard Operating Procedures (SOPs) as issued by Government.

112 views0 comments

Comments


bottom of page